A floating glass calendar grid with some tiles glowing copper and cyan

PlanningBeginnerAbout 45 minutes

A month of content planned in one afternoon

Define a few content pillars, have a text model draft a calendar, and review it into a plan you can batch and track.

What you will make

A four-week content calendar with pillars, post ideas, formats and a status column you can track in Notion or Airtable.

Best for: Solo owners and small teams who post inconsistently because planning takes too long.

Before you start

  • One sentence about your business and your customer.
  • The platforms you will actually post on (two at most to begin with).
  • A place to keep the plan, such as a Notion database or an Airtable base.

Steps

  1. Choose three to four pillars

    Pillars are recurring topics: behind the scenes, how-to, customer questions, product highlights. Each should serve a real customer need. Too many pillars and nothing feels consistent.

  2. Collect real raw material

    List actual customer questions, recent orders, photos you already have and things you explained this week. Real material is what stops AI-written plans sounding generic.

  3. Generate a draft calendar

    Give the text model your pillars, raw material, platforms and posting frequency, and ask for a table. Ask for ideas, not finished posts.

  4. Edit hard

    Cross out any idea you could not realistically make with the photos or time you have. Replace generic ideas with specific ones from your raw material. Keep your own voice by rewriting the first line of each post yourself.

  5. Batch by format

    Shoot or write all the how-to posts together, all the product posts together. Batching by format is where the time saving comes from, not from the AI draft.

  6. Put it in a tracker

    Create columns for date, platform, pillar, idea, asset link and status (idea, drafted, approved, scheduled, posted). A tracker you check weekly beats a perfect plan you never open.

  7. Review monthly

    Look at which posts brought replies, saves or sales, then keep what worked and drop what did not. Feed the findings into next month’s prompt.

Prompts

Replace anything in [square brackets]. Prompts are starting points: results vary between tools and versions, so review every output.

Prompts are written in English because image, video and most text models follow English instructions best. To get answers in your language, add “Reply in English.” to a prompt for a text assistant.

Four-week calendar English

Use this with a text model to get the first draft.

Business: [one sentence]. Customer: [who]. Platforms: [list]. Frequency: [posts per week]. Pillars: [list]. Real raw material I have: [list questions, photos, recent events]. Create a 4-week content calendar as a table with columns: date, platform, pillar, idea (one line), format, what asset I need. Use only the raw material and ideas I could make in under an hour each. Do not invent customer quotes or statistics.

Idea sharpener English

Use this on any idea that feels generic.

This post idea feels generic: [idea]. Using this real detail from my business: [detail], give 3 more specific versions, each with a first line that sounds like a person and not an advert.

Monthly review English

Use this at the end of the month.

Here are my posts and results for the month: [paste table]. Without over-claiming from small numbers, list what seems to be working, what is inconclusive, and 5 ideas to test next month.

Checklist before you publish

Tick items as you go. Nothing is saved or sent.

0 of 5 checked

Common mistakes

  • Publishing AI-written posts without rewriting the first line.
  • Planning for five platforms and posting on none.
  • Never reviewing results.
  • Keeping the plan somewhere you do not open.

Automate the next step

Related guides